Jahra Road and Jamal Abdul Nasser Street


The project location starts from the Sheraton roundabout up to the UN roundabout on the 4th ring road. Pace scope of work included the consultancy services for study, design, upgrade and construction supervision of  Jamal Abdul Nasser Street and Jahra Road over an approx. length of 21.1 km, which involves the upgrading of the existing roads to expressway standards, from the intersection with 2nd Ring Road to the intersection with Abu Dhabi Street and upgrading Jahra Road section to motorway standard, from 2nd Ring Road to UN Roundabout.The work includes all the relevant modifications, relocation and protection of existing services. This project is a joint venture between Pace and Louis Berger Group.

Client: Ministry of Public Works  (MPW)

Completion Date: 2015

Cost: US$ 931.8 million

Components: Road, Study, Wastewater

Services: Study, Design and Construction Supervision

Associates: LBG Group