Project Description:

The required Bypass road, located at the western side of Baku City, consists of 5.5 km of a newly constructed highway beginning at the Tibilisi Avenue and extending southerly towards the intersection of Baku-Alyat Highway with Lokbatan Road. The bypass road consists of three sections, the first 5.5 km, the second of 8.9 km and the third consists of 7.1 km forms one part of Baku-Alyat Highway, (i.e. total 21.5 km).
The project also includes Construction of three interchanges, which consists of two overpass, one underpass and a flyover viaduct, a number of vehicular and pedestrian’s crossings and other drainage structures. |
|